Below you can see the benefits of our selected solutions from projects implemented in different climatic and site conditions.
The Arctic LNG 2 Project involves the construction of the FACILITY, a fixed nearshore terminal for the production, storage and offloading of liquefied natural gas (LNG) and stable gas (SGC).
The West Qurna 1 PW2 project treats produced water from stations 6, 7 and 8, providing the plant with a capacity of 210 kbwpd, ensuring uninterrupted and efficient operation.
The project includes the construction of additional production and infrastructure facilities to meet Lukoil Mid-East’s production target of 800 kBOPD per day at the West Qurna-2 field.
The TANAP Project includes a pipeline that will transport 31 billion m³ of natural gas per year from Azerbaijan to Turkey and Europe.
TURKAKIM natural gas pipeline is 142 km long and 48-inch diameter. SCADA and telecommunication transmission is provided by fiber optic cable system.
The Tuz Gölü Underground Natural Gas Storage Facility Expansion Project will increase the working gas capacity of the existing storage facility to 5.2 billion Nm3 with the help of 40 new caverns.
Material supply, field assembly and commissioning operations within the scope of Saros FSRU Terminal and Natural Gas Pipeline Project.
ENKA-Siemens consortium signed a construction contract for the accelerated construction of the Tripoli West 671 MW Simple Cycle Power Plant in Libya in 2017.
Inspection of the 18″ Rabi-Cap-Lopez Pipeline from Rabi Petrol Station to Batanga Station was carried out on the dates of GEO+ vehicle survey and MFL/DMR vehicle survey.
The contract for the STAR Refinery, which will have an annual capacity of 10 million tons of crude oil on an area of approximately 2,300 acres on the Petkim Peninsula.