TurkStream Project Coastal Transition Section-2
The length of the TURKAKIM gas pipeline is 142 km and its diameter is 48 inches (122 cm).
A Fiber Optic Cable System running parallel to the pipeline provides a modern telecommunication system along the pipeline and a backup system for uninterrupted transmission of SCADA signals. 5 (five) main line blocks are monitored and controlled by SCADA system…
Project Location: Turkey
CUSTOMER: GAZPROM
Contractor: ACD İnşaat Ticaret Ltd. Şti. // TÜRKAKIM GAZ TAŞIMA A.Ş. //Comita D.D.
Corrosion Protection Type: Impressed Current CP System for underground pipings
Design Life: 30 years
Contract Type: Lump Sump