Project Description

TURKSTREAM PROJECT ONSHORE SECTION-2

  1. Brief Project Description:TurkStream gas pipeline is 142 km in length, with a diameter of 48 inches. The modern Telecommunication system along the pipeline is provided via a Fiber Optic Cable System running parallel to the Pipeline, with a back-up system to ensure an uninterrupted transmission of SCADA signals. The SCADA system monitor and control the 5(five) mainline block valve stations and 1 (one) PIG launcher station.The landing point in Turkey is Kıyıköy, a village in the district of Vize in Kırklareli Province at northwestern Turkey. From there, the 70 km section (Onshore Section-1) of the first line towards to national transmission connection at Misinli village in Lüleburgaz. The second line which is called as Türk Akım Gas Pipeline (Onshore Section-2) continues from Kıyıköy to Malkoçlar on Turkey–Bulgaria border, where it is connected to the existing Trans-Balkan pipeline system.Brief CP Scope:Kortek has been awarded for 3 different contracts as follows:1 – CP Works for Turkstream Gas Pipeline (142 km length) (Contractor: ACD İnşaat)

    Material supply, installation and commissioning works have been completed in 2020 within the scope of this project that includes 4 TR Unit, 4 horizontal anode groundbed (with equipment such as MMO anodes, coke breeze, cables etc.) and 145 Test Post along the route.

    2- Monthly CP Maintenance and Supervision Works for Kıyıköy Station (Contractor: Comita D.D.)

    Scope of work includes the provision of all necessary manpower and equipment and tools to perform the regular monitoring and maintenance activities for all cathodic protection system facilities of Turk Stream Receiving Terminal (Kıyıköy)

Contact Us Today